Consulte suas faturas:
BMTE – Belo Monte Transmissora de Energia
  Latest News

Nota de Esclarecimento

ESCLARECIMENTO SOBRE O DESLIGAMENTO OCORRIDO NO ULTIMO DIA 21 DE MARÇO DE 2018.

The inauguration ceremony of the first transmission line of ± 800 kV UHVDC – Ultrahigh-Voltage Direct Current – of Latin America was taken place by Belo Monte Transmissora de Energia on December 21st, 2017 in Ibiraci – MG

Institutional Video of Inauguration of the project

First transmission bipole of ± 800 kV UHVDC goes into operation two months in advance

  Galeria